Using a float to smooth the surface.
Concrete loading dock ramp design.
It is secured to the dock by chains or optional dock chain brackets.
To design efficient loading docks determine the.
Hd at the dock.
Ground to dock loading ramps for easier handling of freight off docks.
For example in figure 29 the drive approach is an 8 decline leading to a level concrete pad at the dock.
Rotary finish at the top of the ramp with a broom finish at the lower part of the ramp.
Concrete has been freshly poured.
The most important characteristic of the loading dock design is the height of the dock.
15 ft wide minimum behind the loading ramps.
However if space does not permit you may increase the slope to an absolute maximum of 10 and this will work only for light loads.
Forklift dock ramp concrete loading dock design.
The bluff loading dock ramp is set in place at concrete or portable steel loading dock when it is unloaded from the trailer.
Height hl from the decline drive will be at approximately 40 in.
The dockleveler bridges some height difference but the incline should not be too steep.
Ramp up for a loading dock.
The dock height must match the height of the docking trucks.
A typical trailer bed which is at a 48 in.
The height difference between the dock and the trailer bed should be as small as possible.
Steep slopes force dock workers to load on an incline inside the truck and may cause loads to topple.
That s it your bluff loading dock ramp is ready to use.
Beginning stages of finishing.
Using a float to flatten the surface.