Not only does secura prevent sloping site issues and create a more efficient use of land but the mortar free product is cost effective and provides a fast and easy installation process.
Concrete retaining wall systems uk.
Stage 1 excavate and cast a reinforced raft.
Lock load is wet cast manufactured panel made with 5500 psi 6 air entrained fiber steel reinforced concrete and when the counterfort is attached produces the largest manual installed retaining wall system.
Storage capacity units are designed to be loaded from either side with the following conditions.
The terraforce l15 interlocking mortarless concrete hollow block retaining wall system provides the solution to projects requiring soil retaining walls erosion protection garden terracing and reinforced slopes.
Interlocking retaining wall block uk for garden landscaping soil erosion control.
Barcon systems designs and manufactures bespoke precast concrete retaining walls to specific site requirements.
Stage 3 pour concrete between the blocks to cast the reinforced concrete wall.
Fp mccann offers an industry leading range of standard and bespoke retaining and containing walling solutions.
Stage 2 lay two row of block two block high with a 300mm gap in between the rows of blocks.
From supply only to fully designed and fitted schemes fp mccann can offer a full service.
With over 90 years of combined experience at our lydney and grantham works we are able to deliver high quality precast concrete products at competitive market rates to all of great britain.
Precast concrete retaining walls we are proud to offer the largest range of precast concrete retaining walls available in the uk.
In the product boxes above we have highlighted the specific characteristics and features of each precast solution to assist with product selection.
Precast concrete retaining wall designs are cost effective quick to install can be designed on a job by job basis to cater for various loadings and environmental conditions and as the units are manufactured and cured offsite.
Cast in the wall started bars.
Retained material level with the top of the wall and with an applied surcharge of 10kn m or a sloping backfill with a maximum.